Step-by-Step Building Design Process
We review your site, brief, budget and planning controls before developing the design and preparing drawings for the appropriate DA, CDC or Construction Certificate pathway. Consultant coordination and NSW Planning Portal lodgement are managed where included in scope.
01.
Site Information Before Design
Before your design consultation, we usually ask you to obtain a current site survey and Section 10.7 Planning Certificate. These confirm key site details such as boundaries, levels, easements, zoning and planning controls, giving the project a proper starting point before design work begins.
03.
Site Review & Planning Constraints
We review the planning controls and site conditions that may affect what can be built. This can include setbacks, building height, floor space, solar access, privacy, parking, stormwater, BASIX, NatHERS, bushfire, heritage and council-specific requirements.
05.
Concept Design
The concept design stage turns your brief and site review into an initial design solution. This is where floor plans, room relationships, external form, rooflines, elevations, street presentation and outdoor areas are developed.
07.
DA, CDC & Approval Documentation
Once the design direction is resolved, we prepare the drawings and documentation needed for your DA, CDC or Construction Certificate pathway. This may include site plans, floor plans, elevations, sections, shadow diagrams, BASIX coordination, NatHERS coordination and supporting documents for council, a certifier or the NSW Planning Portal.
